July 9, 2020 Alden Library - Substation Cable Replacement Project – Power Outage The Design and Construction Department has scheduled work as part of the Substation Cable Replacement Project on Saturday, July 25th, 2020 from 6:00 a.m. – 10:00 p.m. As a result, there will be no power and building temperatures will be warmer than normal during this time. The following buildings will be affected: Alden Library Bryan Hall Cutler Hall Edward’s Accelerator Ellis Hall Galbreath Chapel Gordy Hall McGuffey Hall McKee House Scott Quadrangle Tupper Hall Wilson Hall (College Green) Walter International Education Center 35 Park Place 29 Park Place, President’s Residence 29 Park Place, Carriage House This outage is required to replace a cable at the Alden Library Substation. Please feel free to contact the Facilities Management & Safety Work Center at 593-2911 if you have any questions or concerns. -------------- next part -------------- An HTML attachment was scrubbed... URL: < http://listserv.ohio.edu/pipermail/ouanotifications/attachments/20200709/dfc622b6/attachment.html >
(740) 593–9381 | Building 21, The Ridges
Ohio University | Athens OH 45701 | 740.593.1000 ADA Compliance | © 2018 Ohio University . All rights reserved.