Sputter Source Instructions

Cs Sputter Source Startup Procedure

General Considerations

General Preparations

  1. Ensure that desired beam target is loaded.
  2. Set buncher tubes to correct configuration for desired beam species.
  3. Check vacuum on LE extension, temperature gauge on cryopump should be at minimum value.
  4. Open source gate valve by pressing either button on gate valve control at source gate.
  5. Remove grounding hook from power supply platform and hang on gate before closing.
  6. Close both gates to source area. Orange lights on Glassman supplies should come on at gate closing. (If not, check other gate on the other side of the accelerator; both must be secured.)
  7. Press the doorbell button on top the Pelletron AC Power Center. The Extractor and Target Glassman supplies should indicate Voltage Control with red lights.

Startup and Normal Operation (in control room)

  1. Turn on and set the Del main extractorsupply to the desired voltage for the particular buncher setting.
  2. Turn up the ionizer heater. The ionizer operates at 21 amperes. Keep in mind that the current will fall slightly as the ionizer gets warmer. Keep adjusting the current until the ionizer is stable at 21 A. It should take about 2 minutes to reach 21 A from the standby value of 10 A.
  3. Turn up the Cesium feed tubeheater to 0.450 amperes.
  4. Set the cesium reservoirheater to 0.275. This should be enough to give ones of microamps beam for p and d. A setting of about 0.280 - 0.300 should produce tens of microamps. Cs vaporization starts at a temperature of ~80° Celsius. The maximum reservoir temperature should not exceed 130° Celsius. The reservoir current should not exceed 0.300.
  5. Set the Glassman extractorpower supply to 12.5 KV. Check to be sure the current is less than about 5 milliamps and the “control milliamperes” light is NOT lit. High current indicates that the source needs to be serviced.
  6. Set the Glassman targetpower supply to 6.5 kV. Check to be sure the current is less than about 5 milliamps and the “control milliamperes” light is NOT lit. High current indicates that the source needs to be serviced.
  7. Set the Glassman lenspower supply to 1.5 kV.
  8. Tune the beam with the inflection magnet, source lens (usually about 1.5 kV), einzel lens A, and 2Y steerer.The 2X steerer should be neutral (5.00 on dial) as X steering is be done by the inflection magnet at this stage.
  9. Monitor the target and extractor currents: target current should be around 2.5 milliamps, and no more than 5 mA.

Out-gassing the source after cleaning

  1. The source gate valve should be closed for this operation.
  2. Wait for normal vacuum. Normal is when the needle is in the blue mark on the gauge above the TV in the control room.
  3. Set ionizer to 10A. This will lead to a rise in the vacuum pressure.
  4. Wait for vacuum to fall back to the blue mark on the gauge
  5. Raise the ionizer by an additional 2-3 A and wait for the vacuum to fall back into the blue range.
  6. Repeat this process until the ionizer is at 21 A and the vacuum is in the blue range, may take 8 hours.
  7. Open the source gate valve and carry out the Startup and Normal Operation.

Checklist for Target Pellet Change

Shut Down Procedure

  1. Turn down the cesium reservoir heater power supply. Off is about 0.070 A.
  2. Wait for the reservoir temperature to drop below 80° C.
  3. Turn down the feed tube power supply.
  4. Wait for the feed tube temperature to drop below 80° C.
  5. Wait for the Target Supply current to fall to less than 1 milliamp.
  6. Turn the ionizer current down to 10 amps. (The ionizer current should be left at 10 amps. This helps avoid the “poisoning” of the ionizer.)
  7. Turn down target and extractor voltages to zero.
  8. Turn off DEL high voltage supply.
  9. Close sputter source vacuum gate valve.